| General Facilities/Infrastructure | | |  | | | | Gateway has a fully owned and equipped with State of Art designed office space at our Offshore Development Center in India. | | |  |  | Adequate storage area with round the clock security |  |  | Adequate fire safety systems |  |  | Ergonomically designed furniture | | | | | Internet Connectivity | | We have a dedicated leased line for all our development facility supported by a backup broadband cable link incase the leased line fails. All the facilities have dedicated dialup terminals in the offices incase of extreme contingency. | | | | Online Communication |  |  | We use VOIP based phone to call into our clients globally and to receive calls into our office with local US numbers and toll free numbers for clients and potential customers globally. |  |  | We use online collaboration tools like "GatherPlace" and "gotomeeting" for online demo, training, user acceptance and collaboration. |  |  | We have video conferencing facility for interaction of our team with our clients internationally. |  |  | 24 x 7 Voice over IP calling facility is available for cost effective calling to our clients globally for long discussions on projects. |  |  | From the front desk to the managing director most of our office team members are available on instant messengers making our team more accessible to our clients than their own team on a separate floor of the same building. Refer to client speak for what our clients say about our accessibility and speed of responding to their needs. |  |  | Our global offices are connected via PAP (Permanent Availability Protocol) setup which involves having a end to end connectivity between offshore setup and client / our offices with possibilities of voice chat, video conference, sharing a white board, remote installations, access into each others networks, and a powerful CRM system which we use for continuous updation of day to day activities and efforts. | | | | | Systems - Working Environment | | |  |  | Software in use | | |  |  | | Software in use | | Adobe Photoshop | | Adobe Illustrator | | Adobe InDesign | | Adobe PageMaker | | CorelDraw | | Quark Xpress | | Adobe Premiere | | Adobe Aftereffects | | RoboDemo | | Adobe Flash | | Adobe Flex | | 3D Max | | Maya | | | |  |  | Hardware | | |  |  | | Hardware Requirements | Gateway Infrastructure | | Machine | Dedicated Workstations (Windows and MAC) | | OS | Win XP Pro (SP2) , MAC OSX 10 | | Processor | Two 2.66GHz Dual-Core Intel Xeon | | Graphics Accelerator | NVIDIA GeForce 7300 GT graphics with 256MB memory | | RAM | 2-8 GB DDR RAM | | Monitor | 17 " CRT & TFTs | | Hard Disk | 80-750 GB | | | | | | |
|